Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Dec 12, 2022     More tips - (5 hours)       Category: Tail Feathers
Sam continued to finish up the left HS and elevator tips by epoxying in aluminum bracket to both tips to support the factory end of the blind rivets. Edge distance is an issue that can't really be resolved, so we'll epoxy the elevator tips in as well. I started trimming the right HS and elevator tips. Match drilled the elevator tip to the elevator and deburred. Laid out the 4 upper and lower rivet lines for the HS stab tip, match drilled and deburred. Installed both right elevator and HS tips and trimmed for 1/8” spacing.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.